Dove Valley Road over Dry Wash
0.3 mi W of Paloma Pkwy · County 013, Arizona · Built 2012 · 2 Lanes · 2,101 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.7838, -112.1043
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 14 years old.
Nearby Bridges
Slide Rock Road over Dry Wash
Built 2007
Dove Valley Road over Dry Wash
Built 2007
Dove Valley Road over Dry Wash
Built 2006
Bronco Butte over Dry Wash
Built 2006
Desert Wildflower over Dry Wash
Built 2009
Bronco Butte Trail over Dry Wash
Built 2006
Desert Wildflower over Dry Wash
Built 2009
North Foothills Dr over Dry Wash
Built 2007
North Foothills Dr over Dry Wash
Built 2006
Westland Road over Dry Wash
Built 2007
Bridge Details
- Structure #
- 10976
- Year Built
- 2012
- Length
- 11.6 m (38.1 ft)
- Max Span
- 3.7 m
- Width
- 33.5 m (109.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,101
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.