Ironwood Drive over Wash
Ironwood Drive · County 021, Arizona · Built 2009 · 4 Lanes · 18,881 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.294667, -111.563444
This bridge is in worse condition than 67.5% of bridges in County 021. The average bridge in Arizona is 0 years old; this one is 17 years old.
Nearby Bridges
Ironwood Drive over ADOT Channel
Built 2022
Ironwood Drive over Wash
Built 2009
Meridian Road over ADOT Channel
Built 2022
Ironwood Drive over Wash
Built 2009
SR-24 Gateway Fwy over Mountain Road
Built 2022
SR-24 Gateway Fwy over Mountain Road
Built 2022
Mountain Road over ADOT Channel
Built 2022
Signal Butte Road over ADOT Channel
Built 2022
Veneto Rd over Pima Rd Drainage Channel
Built 2015
Meridian Rd over Wash
Built 2014
Bridge Details
- Structure #
- 10918
- Year Built
- 2009
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Width
- 43.9 m (144 ft)
- Lanes
- 4
- Daily Traffic
- 18,881
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.