Irvington Road over Drainage Channel

0.3 mi E Jct Tucson Blvd · County 019, Arizona · Built 1996 · 5 Lanes · 22,218 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
10309
Year Built
1996
Length
13.7 m (44.9 ft)
Max Span
3 m
Lanes
5
Daily Traffic
22,218
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.