Thompson Peak Pkwy over Wash & Golf Path
0.1 mi SW Jct Hayden Rd · County 013, Arizona · Built 1997 · 2 Lanes · 6,331 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.6707, -111.9089
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 29 years old.
Nearby Bridges
Thompson Peak Pkwy over Wash & Golf Path
Built 1997
Grayhawk Dr over Wash
Built 1995
Thompson Peak Pkwy over Wash Talon Golf Path
Built 1997
Thompson Peak Pkwy over Talon Golf Path
Built 1997
Hayden Rd over Wash
Built 2004
SR101L over Miller Rd
Built 2020
Loop 101 over Wash
Built 2002
SR101L over Miller Rd
Built 2020
Pima Freeway 101L over Hayden Road
Built 2002
Deer Valley Rd over Channel
Built 1998
Bridge Details
- Structure #
- 10211
- Year Built
- 1997
- Length
- 15.8 m (51.8 ft)
- Max Span
- 15.2 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 2
- Daily Traffic
- 6,331
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.