Tatum Boulevard over Dry Wash
Tatum 100 S/O Juana Ct · County 013, Arizona · Built 1995 · 4 Lanes · 23,346 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.743208, -111.978256
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 31 years old.
Nearby Bridges
Tatum Boulevard over Dry Wash
Built 1995
Tatum Boulevard over Dry Wash
Built 1994
50th Street over Dry wash
Built 2002
Dynamite Rd over Dry Wash
Built 2006
Desert Willow Pk E over Dry wash
Built 2002
Desert Willow PwyE over Dry wash
Built 1998
Tatum Boulevard over Dry Wash
Built 1991
Cave Creek Rd over WASH
Built 1991
Cave Creek Rd over Dry Wash
Built 1991
56th St over Wash
Built 1997
Bridge Details
- Structure #
- 10202
- Year Built
- 1995
- Length
- 10.4 m (34.1 ft)
- Max Span
- 2.4 m
- Lanes
- 4
- Daily Traffic
- 23,346
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.