Verrado Way over Buckeye Canal

1 mi N/ MC85 · County 013, Arizona · Built 1998 · 2 Lanes · 3,443 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
10126
Year Built
1998
Length
13.1 m (43 ft)
Max Span
12.8 m
Width
25.6 m (84 ft)
Lanes
2
Daily Traffic
3,443
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.