Greenway Parkway over SERVICE ROAD
0.3 MI E/O 66TH STREET · County 013, Arizona · Built 1993 · 7 Lanes · 33,839 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.624417, -111.938697
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 33 years old.
Nearby Bridges
ACOMA DR @ 62ND ST over Dry Wash
Built 1979
Redfield Rd over Channel
Built 1975
Scottsdale Rd over CAP Canal
Built 1978
Paradise Dr over Channel
Built 1993
Princess Dr over Drainage channel
Built 2006
Princess Dr over Drain Channel
Built 1986
Thunderbird Rd over Wash
Built 1991
Chauncey Lane over Drainage channel
Built 2006
Greenway-Hayden Rd over CAP Canal
Built 1996
Greenway-Hayden Rd over Golf Course
Built 1997
Bridge Details
- Structure #
- 10069
- Year Built
- 1993
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Width
- 39.5 m (129.6 ft)
- Lanes
- 7
- Daily Traffic
- 33,839
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.