BASELINE ROAD over Western Canal

Baseline Rd E Of 4th Ave · County 013, Arizona · Built 1986 · 4 Lanes · 39,708 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
09922
Year Built
1986
Length
36 m (118.1 ft)
Max Span
4.6 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
39,708
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.