Woods Rd over Gila Bend Canal

E/ Old US-80 · County 013, Arizona · Built 1994 · 2 Lanes · 769 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

33.130725, -112.671486

This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 32 years old.

Nearby Bridges

Bridge Details

Structure #
09919
Year Built
1994
Length
13.4 m (44 ft)
Max Span
13.1 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
769
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.