Bush Hwy over Salt River

at Blue Point-Salt River · County 013, Arizona · Built 1991 · 2 Lanes · 5,425 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

33.554122, -111.575589

This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 35 years old.

Nearby Bridges

Bridge Details

Structure #
09849
Year Built
1991
Reconstructed
1999
Length
146.8 m (481.6 ft)
Max Span
36.6 m
Width
22.2 m (72.8 ft)
Lanes
2
Daily Traffic
5,425
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.