Willow Creek Road over Desert Wash
0.46 mi S. Pioneer Pkwy · County 025, Arizona · Built 1963 · 4 Lanes · 8,222 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
34.6229, -112.4419
This bridge is in worse condition than 55.6% of bridges in County 025. The average bridge in Arizona is 0 years old; this one is 63 years old.
Nearby Bridges
SR89A & 89 over Wash
Built 1986
SR 89A over SR 89
Built 2008
SR 89A over SR 89
Built 2008
SR 89 over Target Range Wash
Built 1957
SR 89 over Willow Creek
Built 1954
Larry Caldwell Dr over SR 89A
Built 2001
Willow Creek Road over Willow Creek
Built 2000
SR89A NB over Granite Creek
Built 2001
Granite Dells Rd over Granite Creek
Built 1973
SR89A SB over Granite Creek
Built 2001
Bridge Details
- Structure #
- 09471
- Year Built
- 1963
- Reconstructed
- 2002
- Length
- 7.6 m (24.9 ft)
- Max Span
- 3.7 m
- Lanes
- 4
- Daily Traffic
- 8,222
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.