51st Avenue over Arizona Canal

0.05 mi S of Cactus Road · County 013, Arizona · Built 1969 · 6 Lanes · 43,025 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
09440
Year Built
1969
Reconstructed
1983
Length
15.5 m (50.9 ft)
Max Span
7.3 m
Width
24.1 m (79.1 ft)
Lanes
6
Daily Traffic
43,025
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.