IRR Pima Road over Arizona Canal
0.6mi S of Ind Bnd on Pim · County 013, Arizona · Built 1968 · 2 Lanes · 9,755 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.5316, -111.8915
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 58 years old.
Nearby Bridges
SR Loop 101 over Arizona Canal
Built 1996
SR Loop 101 over McDonald Drive
Built 1991
SR Loop 101 over Indian Bend Road
Built 1991
Via Paseo del Sur over Channel
Built 1975
Hayden Road over Arizona Canal
Built 1975
Hayden Road over Interceptor Channel
Built 1978
McDonald Drive over Indian Bend Wash
Built 1974
McDonald Drive over Indian Bend Wash
Built 1975
Indian Bend Rd over Indian Bend Wash
Built 2010
Indian Bend Rd over Indian Bend Wash
Built 2010
Bridge Details
- Structure #
- 09353
- Year Built
- 1968
- Reconstructed
- 2019
- Length
- 36 m (118.1 ft)
- Max Span
- 11.9 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 2
- Daily Traffic
- 9,755
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.