IRR Pima Road over Arizona Canal

0.6mi S of Ind Bnd on Pim · County 013, Arizona · Built 1968 · 2 Lanes · 9,755 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
09353
Year Built
1968
Reconstructed
2019
Length
36 m (118.1 ft)
Max Span
11.9 m
Width
21.9 m (71.9 ft)
Lanes
2
Daily Traffic
9,755
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.