Thunderbird Road over Sweetwater Wash

0.7 mi E of 19th Avenue · County 013, Arizona · Built 1974 · 6 Lanes · 33,403 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
09321
Year Built
1974
Reconstructed
1984
Length
18 m (59.1 ft)
Max Span
8.8 m
Width
32.5 m (106.6 ft)
Lanes
6
Daily Traffic
33,403
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.