Baseline Road over Eastern Canal

1/2 mi E Greenfield · County 013, Arizona · Built 1972 · 5 Lanes · 28,294 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
09300
Year Built
1972
Length
8.8 m (28.9 ft)
Max Span
8.2 m
Width
30.8 m (101 ft)
Lanes
5
Daily Traffic
28,294
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.