Northern Avenue over Arizona Canal

0.18 mi E of 7th Street · County 013, Arizona · Built 1946 · 6 Lanes · 41,491 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
09206
Year Built
1946
Reconstructed
1980
Length
13.7 m (44.9 ft)
Max Span
6.7 m
Width
23.7 m (77.8 ft)
Lanes
6
Daily Traffic
41,491
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.