Bell Road over New River

0.2 mi W Jct L101 · County 013, Arizona · Built 1964 · 6 Lanes · 65,040 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
09125
Year Built
1964
Reconstructed
1977
Length
83.8 m (274.9 ft)
Max Span
18.3 m
Width
37.2 m (122 ft)
Lanes
6
Daily Traffic
65,040
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.