Crismon Rd over CAP Canal

500 N/ Apache Trail · County 013, Arizona · Built 1983 · 2 Lanes · 9,917 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
08856
Year Built
1983
Length
33.2 m (108.9 ft)
Max Span
32.6 m
Width
17.9 m (58.7 ft)
Lanes
2
Daily Traffic
9,917
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.