MOUNTAIN PARKWAY over Drainage Channel

N. OF CHANDLER BOULEVARD · County 013, Arizona · Built 1984 · 4 Lanes · 7,147 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
08848
Year Built
1984
Length
7.6 m (24.9 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
7,147
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.