Jesse Hayes Rd over Pinal Creek

100 ft S Jct Broad St · County 007, Arizona · Built 1920 · 2 Lanes · 5,162 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
08603
Year Built
1920
Reconstructed
1965
Length
38.4 m (126 ft)
Max Span
7 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
5,162
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.