7th Street over CAP Canal

0.38 mi N of Pinnacle Pk · County 013, Arizona · Built 1978 · 2 Lanes · 11,518 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
08579
Year Built
1978
Length
32.9 m (107.9 ft)
Max Span
32.3 m
Width
25 m (82 ft)
Lanes
2
Daily Traffic
11,518
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.