Purdy Lane over Wash
1.4 mi E Jct Naco Rd · County 003, Arizona · Built 1938 · 2 Lanes · 500 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
31.35085, -109.912017
This bridge is in worse condition than 72.9% of bridges in County 003. The average bridge in Arizona is 0 years old; this one is 88 years old.
Nearby Bridges
Purdy Lane over Desert Wash
Built 1938
Purdy Lane over Wash
Built 1938
Purdy Lane over Wash
Built 1938
Purdy Lane over Desert Wash
Built 1938
Purdy Lane over Green Bush Draw
Built 1938
Naco-Don Luis Hwy over Desert Wash
Built 1961
Warren Road over Greenbush Draw
Built 1939
Naco-Don Luis Hwy over Greenbush Draw
Built 1974
Bisbee Junction over SPRR
Built 2004
Naco-Don Luis Hwy over Wash
Built 1974
Bridge Details
- Structure #
- 08114
- Year Built
- 1938
- Length
- 6.4 m (21 ft)
- Max Span
- 1.8 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.