Portal Road over San Simon River

2.2 mi S Jct Power Rd · County 003, Arizona · Built 1957 · 2 Lanes · 350 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
08091
Year Built
1957
Length
61 m (200.1 ft)
Max Span
10.7 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
350
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.