Airport Upper Road over Airport Lower Road

TERMINAL 4 · County 013, Arizona · Built 1991 · 2 Lanes · 13,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
07981
Year Built
1991
Length
137.2 m (450.1 ft)
Max Span
27.4 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
13,400
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.