Chandler Boulevard over Dry Wash

0.02 mi W of 7th Drive · County 013, Arizona · Built 1991 · 4 Lanes · 12,269 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
07930
Year Built
1991
Length
7 m (23 ft)
Max Span
3.7 m
Width
12.8 m (42 ft)
Lanes
4
Daily Traffic
12,269
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.