Doubletree Rnch Rd over Drain Channel

0.3 mi E Invergordon Rd · County 013, Arizona · Built 1989 · 2 Lanes · 8,195 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
07867
Year Built
1989
Length
19.8 m (65 ft)
Max Span
3 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
8,195
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.