Sweetwater Drive over Roger Wash
at Roger Wash · County 019, Arizona · Built 1989 · 2 Lanes · 500 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.279858, -111.046383
This bridge is in worse condition than 69.1% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 37 years old.
Nearby Bridges
El Camino del Cerr over Santa Cruz River
Built 1979
Business Access Rd over Drainage Channel
Built 2002
I-10 over Wash
Built 2012
Ruthrauff Rd over I-10
Built 2019
Ruthrauff Rd over UPRR
Built 2019
Ruthrauff Rd over Davis Avenue
Built 2021
I-10 over Wash
Built 2012
Prince Road over Union Pacific RR
Built 2013
Prince Rd over I-10
Built 2013
Sunset Road over Santa Cruz River
Built 2017
Bridge Details
- Structure #
- 07764
- Year Built
- 1989
- Length
- 86.3 m (283.1 ft)
- Max Span
- 6.7 m
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.