Sun Valley Pkwy-50 over Wash

11.2 mi N/ McDowell Rd · County 013, Arizona · Built 1989 · 4 Lanes · 933 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
07675
Year Built
1989
Length
13.7 m (44.9 ft)
Max Span
3.4 m
Lanes
4
Daily Traffic
933
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.