Estrella Parkway over Gila River

0.8 mi S of Broadway · County 013, Arizona · Built 1988 · 2 Lanes · 11,955 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
07565
Year Built
1988
Length
662.9 m (2174.9 ft)
Max Span
36.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
11,955
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.