94th Street over Drain Channel

0.16 mi N of Union Hills · County 013, Arizona · Built 1988 · 2 Lanes · 1,010 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
07532
Year Built
1988
Length
40.8 m (133.9 ft)
Max Span
13.4 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
1,010
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.