Pima Rd over Drain Channel

0.20 mi N of Union Hills · County 013, Arizona · Built 1989 · 3 Lanes · 47,310 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
07528
Year Built
1989
Length
31.1 m (102 ft)
Max Span
15.2 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
47,310
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.