Williams Field Rd over ADOT Channel
Williams Field & SR-24 · County 013, Arizona · Built 2022 · 7 Lanes · 10,000 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.306, -111.6214
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 4 years old.
Nearby Bridges
SR-24 Gateway Fwy over Ellsworth Road
Built 2022
Ellsworth Rd over Drainage Channel
Built 2022
Signal Butte Road over ADOT Channel
Built 2022
Signal Butte Rd over Powerline Fldway Channel
Built 2014
Williams Gatewy Fr over Powerline Fldwy Channel
Built 2015
Mountain Road over ADOT Channel
Built 2022
SR-24 Gateway Fwy over Mountain Road
Built 2022
SR-24 Gateway Fwy over Mountain Road
Built 2022
Ray Rd over Powerline Fldway Channel
Built 2014
Williams Gatewy Fr over Ray Road
Built 2022
Bridge Details
- Structure #
- 07367
- Year Built
- 2022
- Length
- 13.7 m (44.9 ft)
- Max Span
- 3 m
- Width
- 71.3 m (233.9 ft)
- Lanes
- 7
- Daily Traffic
- 10,000
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.