Dove valley Rd over Buchanan Wash
1.0 mi south of SR74 · County 013, Arizona · Built 2009 · 2 Lanes
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.783333, -112.133333
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 17 years old.
Nearby Bridges
Sonoran Blvd over I-17
Built 2009
Sonoran Bouleverd over Ramp SW
Built 2010
I-17 over Wash
Built 2010
Dove Valley Road over Skunk Creek
Built 2013
I17 NB over Ramp EN
Built 2009
I17 SB over Ramp EN
Built 2009
SB Frontage Road over Ramp EN
Built 2009
SR 303L over Ramp E-N
Built 2010
I-17 SB over Lone Mountain RD (L303)
Built 2009
I-17 NB over Lone Mountain Rd (L303)
Built 2009
Bridge Details
- Structure #
- 07242
- Year Built
- 2009
- Length
- 7.9 m (25.9 ft)
- Max Span
- 2.4 m
- Lanes
- 2
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.