US 60 EB over Wash

2.8 mi E Jct SR 79 · County 021, Arizona · Built 2009 · 2 Lanes · 10,693 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
07189
Year Built
2009
Length
17.1 m (56.1 ft)
Max Span
3 m
Lanes
2
Daily Traffic
10,693
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.