US 191 over Drainage Channel
4 Mi S Jct SR 75 · County 009, Arizona · Built 2003 · 3 Lanes · 3,989 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.8634, -109.293
This bridge is in worse condition than 67.4% of bridges in County 009. The average bridge in Arizona is 0 years old; this one is 23 years old.
Nearby Bridges
US 191 over Drainage Channel
Built 2003
US 191 over Drainage Channel
Built 2003
Cosper Loop over Rocky John Canyon
Built 1900
US191 over Gila River
Built 2008
SR 75 over Rocky John Canyon
Built 1967
US 70 over Slick Rock Wash
Built 1938
BHBCB over Pumroy Canyon
Built 1921
US 70 over Wash
Built 1939
SR 75 over Apache Creek
Built 1967
SR 75 over Kaywood Wash
Built 1940
Bridge Details
- Structure #
- 07100
- Year Built
- 2003
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Lanes
- 3
- Daily Traffic
- 3,989
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.