SR 95 over Wash
9.02 mi S Jct SR 68 · County 015, Arizona · Built 1999 · 6 Lanes · 29,640 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.0549, -114.5892
This bridge is in worse condition than 70.6% of bridges in County 015. The average bridge in Arizona is 0 years old; this one is 27 years old.
Nearby Bridges
SR 95 over Wash
Built 1999
Shopping Center Dr over Drainage Channel
Built 2007
SR 95 over Wash
Built 1999
SR 95 over Wash
Built 1999
Arroyo Vista Drive over Wash
Built 1994
SR 95 over Wash
Built 1999
Arroyo Vista Drive over Wash
Built 1994
Laughlin Parkway over Colorado River
Built 2024
Bullhead Parkway over Fox Wash
Built 1991
SR 95+Miracle Mile over Wash
Built 1999
Bridge Details
- Structure #
- 07061
- Year Built
- 1999
- Length
- 27.1 m (88.9 ft)
- Max Span
- 3 m
- Lanes
- 6
- Daily Traffic
- 29,640
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.