SR 260 over Wash

0.5 mi W Jct US 60 · County 017, Arizona · Built 1999 · 5 Lanes · 13,834 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
07023
Year Built
1999
Length
6.4 m (21 ft)
Max Span
3 m
Lanes
5
Daily Traffic
13,834
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.