IRR Thomas Rd L 10 over Drainage Channel

6.5 mi N Jct US 60 · County 013, Arizona · Built 1993 · 5 Lanes · 2,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
06975
Year Built
1993
Length
7.9 m (25.9 ft)
Max Span
2.4 m
Lanes
5
Daily Traffic
2,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.