SR 77 over Wash
11.3 mi S Jct SR 79 · County 019, Arizona · Built 1985 · 7 Lanes · 32,680 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.4035, -110.9512
This bridge is in worse condition than 69.1% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 41 years old.
Nearby Bridges
First Ave over Canada Del Oro Wash
Built 1984
First Avenue over Canada Del Oro Wash
Built 2006
Lambert Lane over Wash
Built 1994
Naranja Drive over Wash
Built 2005
SR 77 over Canada Del Oro Wash
Built 1985
SR 77 over Wash
Built 1953
Pusch View Lane over Canada Del Oro Wash
Built 2008
SR 77 over Wash
Built 1979
Greenock Dr over Wash
Built 1997
El Conquistador Wy over Wash
Built 1990
Bridge Details
- Structure #
- 06812
- Year Built
- 1985
- Length
- 30.5 m (100.1 ft)
- Max Span
- 3 m
- Lanes
- 7
- Daily Traffic
- 32,680
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.