SR 95 & Mulberry A over Mulberry Wash

20.5 mi S Jct I 40 · County 015, Arizona · Built 1977 · 7 Lanes · 20,778 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
06625
Year Built
1977
Reconstructed
2003
Length
9.4 m (30.8 ft)
Max Span
3 m
Lanes
7
Daily Traffic
20,778
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.