I 10; WB over Wash
34.2 mi West of Jct SR 85 · County 013, Arizona · Built 1968 · 2 Lanes · 14,275 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.533, -113.1335
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 58 years old.
Nearby Bridges
Bridge Details
- Structure #
- 06417
- Year Built
- 1968
- Reconstructed
- 1972
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 14,275
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.