I 10; WB over Wash

36.4 mi East of Jct US 60 · County 012, Arizona · Built 1968 · 2 Lanes · 10,450 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
06284
Year Built
1968
Reconstructed
1994
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
10,450
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.