I 10; WB over Wash

0.4 mi East Jct US 60 · County 012, Arizona · Built 1969 · 2 Lanes · 12,017 vehicles/day

Overall
Good
Culvert
7
Good

Condition Ratings

ComponentRatingDescription
Culvert 7 Good

Location

33.6612, -114.0042

This bridge is in worse condition than 66.7% of bridges in County 012. The average bridge in Arizona is 0 years old; this one is 57 years old.

Nearby Bridges

Bridge Details

Structure #
06240
Year Built
1969
Reconstructed
1974
Length
19.5 m (64 ft)
Max Span
3 m
Lanes
2
Daily Traffic
12,017
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.