I 40; EB over Wash

6.53 mi E Jct SR 64 · County 005, Arizona · Built 1962 · 2 Lanes · 11,223 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
05908
Year Built
1962
Reconstructed
1978
Length
16.2 m (53.1 ft)
Max Span
3 m
Lanes
2
Daily Traffic
11,223
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.