US 60 over Wash

0.5 mi E Jct SR 74 · County 013, Arizona · Built 1965 · 4 Lanes · 14,046 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
04096
Year Built
1965
Length
14.9 m (48.9 ft)
Max Span
3 m
Lanes
4
Daily Traffic
14,046
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.