BOX CANYON over BOX CANYON

.9 MI SW/O BASIN SPRING · County 019, Arizona · Built 1954 · 1 Lanes · 80 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
030502000003263
Year Built
1954
Length
24.4 m (80.1 ft)
Max Span
8 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
80
Material
Concrete
Design
Slab
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$390,000
Total Project Cost
$430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.