TEX CANYON over TEX CANYON
3.3 MI S/O CAMP RUCKER CG · County 003, Arizona · Built 1959 · 1 Lanes · 90 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
31.712494, -109.350453
This bridge is in worse condition than 72.9% of bridges in County 003. The average bridge in Arizona is 0 years old; this one is 67 years old.
Bridge Details
- Structure #
- 030501000003266
- Year Built
- 1959
- Length
- 8 m (26.2 ft)
- Max Span
- 7.7 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 90
- Material
- Concrete
- Design
- Slab
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $120,000
- Total Project Cost
- $160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.