FDR 226 over BAR M CANYON
6 MI SW/O MORMON LAKE · County 005, Arizona · Built 1959 · 1 Lanes · 200 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
34.882189, -111.567753
This bridge is in worse condition than 90.6% of bridges in County 005. The average bridge in Arizona is 0 years old; this one is 67 years old.
Nearby Bridges
I 17; NB over Rock Park Rd
Built 1958
I 17; SB over Rocky Park Road
Built 1976
I 17; NB over Woods Canyon
Built 1958
I 17; SB over Woods Canyon
Built 1976
Fox Ranch Rd TI over I 17
Built 1976
FSR 240 over CASNER DRAW
Built 1957
I 17; NB over Schnebly Hill Road
Built 1958
I 17; SB over Schnebly Hill Road
Built 1958
Pinewood Road over Munds Canyon Wash
Built 1980
I 17; NB over Munds Canyon
Built 1976
Bridge Details
- Structure #
- 030405000003307
- Year Built
- 1959
- Length
- 15.8 m (51.8 ft)
- Max Span
- 15.2 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Tee Beam
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $290,000
- Total Project Cost
- $420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.