FSR 708 over BOULDER CANYON
8 MI W/O STRAWBERRY · County 025, Arizona · Built 1959 · 2 Lanes · 300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
34.39495, -111.650206
This bridge is in worse condition than 93.7% of bridges in County 025. The average bridge in Arizona is 0 years old; this one is 67 years old.
Bridge Details
- Structure #
- 030401000004121
- Year Built
- 1959
- Length
- 12.7 m (41.7 ft)
- Max Span
- 12.4 m
- Width
- 6.9 m (22.6 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete
- Design
- Tee Beam
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $80,000
- Total Project Cost
- $100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.