FSR 229 over FOSTER CANYON
1.5 MI SW/O STONEMAN LK · County 005, Arizona · Built 1972 · 1 Lanes · 225 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
34.755656, -111.534019
This bridge is in worse condition than 90.6% of bridges in County 005. The average bridge in Arizona is 0 years old; this one is 54 years old.
Nearby Bridges
FSR 644 over ROCKY GULCH
Built 1968
Stoneman Lake Road over Double Cabin Draw
Built 1950
STONEMAN LAKE RD over WASH
Built 1957
I 17; SB over Rattlesnake Cnyn
Built 1975
FH-3 Lake Mary Rd over Double Cabin Draw
Built 1936
I 17; NB over Stoneman Lake Road
Built 1958
I 17; SB over Stoneman Lake Road
Built 1958
I 17; NB over Rock Park Rd
Built 1958
I 17; SB over Rocky Park Road
Built 1976
FH-3 Lake Mary Rd over Fulton Canyon
Built 1936
Bridge Details
- Structure #
- 030401000003308
- Year Built
- 1972
- Length
- 9.9 m (32.5 ft)
- Max Span
- 9.4 m
- Width
- 4.6 m (15.1 ft)
- Lanes
- 1
- Daily Traffic
- 225
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $170,000
- Total Project Cost
- $200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.